10km Pipeline completed in Laverton

Mine site dewatering line, Laverton, Western Australia.
10.8 kilometres (6.7 miles) of pipe line.

Pushing the boundaries of innovation, the Fluid Highway® evolution continues with in-situ pipe manufacture, in a remote region of Western Australia.

Without road, rail or telecommunications infrastructure, Long Pipes completed the project with one pipe production machine.

This technological advancement allowed the team to hit its current production target of 1350 metres (4430 feet) per day, of 340mm (13.4 inch) diameter 16 Bar(232 PSI) of water pipe line.

With future improvements to the manufacturing process Long Pipes expects to increase this productionrate.